1. | zero | 2. | \(-\frac12mu^2cos^2\theta\) |
3. | \(-\frac12mu^2sin^2\theta\) | 4. | \(-\frac12mu^2\) |
A particle of mass \(4M\) kg at rest splits into two particles of mass \(M\) and \(3M.\) The ratio of the kinetic energies of mass \(M\) and \(3M\) would be:
1. | \(3:1\) | 2. | \(1:4\) |
3. | \(1:1\) | 4. | \(1:3\) |
1. | \(\mathrm{W}_1=\mathrm{W}_2=\mathrm{W}_3\) | 2. | \(\mathrm{W}_1>\mathrm{W}_2>\mathrm{W}_3\) |
3. | \(\mathrm{W}_1>\mathrm{W}_3>\mathrm{W}_2\) | 4. | \(\mathrm{W}_1<\mathrm{W}_2<\mathrm{W}_3\) |
1. | \(\frac{\pi}{6}\) | 2. | \(\frac{\pi}{3}\) |
3. | \(\frac{\pi}{2}\) | 4. | \(\frac{2\pi}{3}\) |