An acid base indicator has . The acid form of the indicator is red and the basic form is blue. By how much must the pH change in order to change the indicator from 75% red to 75% blue (log 3=0.4770)
1. 0.95
2. 2.3
3. 0.75
4. 5
The dissociation constants for aniline, acetic acid and ionic product of water at are respectively. The degree of hydrolysis of aniline acetate in a decinormal solution is
1. 0.56%
2. 55%
3. 5.6%
4. 2.75%
A solution of benzoic acid (a weak monobasic acid) is titrated with NaOH. The pH of the solution is 4.2 when half of the acid is neutralized. The dissociation constant of the acid will be:
1.
2.
3.
4.
The mixture that shows the maximum buffer capacity is:
| 1. | \( { 0.1 } \mathrm{M} \mathrm{CH}_3 \mathrm{COOH}+0.2 \mathrm{M} \mathrm{CH}_3 \mathrm{COONa} \) |
| 2. | \( { 0.1 } \mathrm{M} \mathrm{CH}_3 \mathrm{COOH}+0.15 \mathrm{M} \mathrm{CH}_3 \mathrm{COONa} \) |
| 3. | \({ 0.05 } \mathrm{M} \mathrm{CH}_3 \mathrm{COOH}+0.15 \mathrm{M} \mathrm{CH}{ }_3 \mathrm{COONa} \) |
| 4. | \({ 0.1 } \mathrm{M} \mathrm{CH}_3 \mathrm{COOH}+0.12 \mathrm{M} \mathrm{CH}_3 \mathrm{COONa} \) |
The pH of a solution containing 0.1 mol of CH3COOH, 0.2 mol of CH3COONa, and 0.05 mol of NaOH in 1 L of solution is-
(pKa of CH3COOH=4.74 and log 5=0.7)
1. 4.56
2. 5.44
3. 5.04
4. 3.74
Find the pH of a mixture of acetic acid and sodium acetate, given that 18 mL of the mixture requires 6 mL of 0.1 M NaOH for neutralization of the acid and 12 mL of 0.1 M HCl for reaction with the salt separately. The pKa of acetic acid is 4.75.
1. 5.05
2. 4.75
3. 4.50
4. 4.60
What is the minimum pH required to prevent the precipitation of ZnS in a solution containing 0.01 M ZnCl₂ and saturated with 0.10 M H₂S?
(Given: Ksp of ZnS = 10⁻²¹, and Ka₁ × Ka₂ of H₂S = 10⁻²⁰)
1. Four (4)
2. Three (3)
3. Two (2)
4. One (1)
Which of the following is an amphiprotic (can accept and give protons) ion?
1.
2.
3.
4.
The ratio of F- and HCOO- in a mixture of 0.1 M HF and 0.2 M HCOOH
| 1. | 2 : 2.3 | 2. | 1 : 3.3 |
| 3. | 3.3 : 2 | 4. | 3.3 : 1 |
A buffer solution is prepared by mixing 10 mL of 1.0 M acetic acid with 20 mL of 0.5 M sodium acetate which is then diluted
to 100 mL with distilled water. If the pKa of is 4.76, the pH of the buffer solution prepared is -
1. 5.21
2. 4.76
3. 4.34
4. 5.35